Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

AbouRizk, S M, Halpin, D W and Wilson, J R (1991) Visual Interactive Fitting of Beta Distributions. Journal of Construction Engineering and Management, 117(04), 589–605.

Abudayyeh, O Y and Rasdof, W J (1991) Design of Construction Industry Information Management Systems. Journal of Construction Engineering and Management, 117(04), 698–715.

Bernold, L E and Treseler, J F (1991) Vendor Analysis for Best Buy in Construction. Journal of Construction Engineering and Management, 117(04), 645–58.

Cole, L J R (1991) Construction Scheduling: Principles, Practices, and Six Case Studies. Journal of Construction Engineering and Management, 117(04), 579–88.

De La Garza, J M and Mitropoulos, P (1991) . Journal of Construction Engineering and Management, 117(04), 736–55.

  • Type: Journal Article
  • Keywords: Engineering firms; Construction industry; Technology transfer; Innovation; Expert systems; Technology assessment;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1991)117:4(736)
  • Abstract:
    Increased complexity of facilities, owners' changing needs, inadequate construction methods, and international competition have created strong demands for advanced construction technology. Recent developments in computer‐aided design and expert systems provide the architecture‐engineering‐construction (AEC) industry with significant potential for innovation. However, adoption of these computer technologies by a majority of AEC firms faces many hurdles. This paper describes, refines, and expands the process of technology transfer in an organization. The process focuses on the transfer of expert‐systems technology and is based on the models of innovation developed by Rogers, Shaffer, and Tatum, and on case studies of expert systems technology adoption in several industries. Understanding the technology transfer process, recognizing its players, and identifying the critical factors affecting it will lead to practical recommendations for increasing the rate of construction innovation and technology transfer.

De La Garza, J M, Vorster, M C and Parvin, C M (1991) Total Float Traded as Commodity. Journal of Construction Engineering and Management, 117(04), 716–27.

de Neufville, R and King, D (1991) Risk and Need‐for‐Work Premiums in Contractor Bidding. Journal of Construction Engineering and Management, 117(04), 659–73.

Kakoto, T and Skibniewski, M (1991) Engineering Decision Support of Automated Shield Tunneling. Journal of Construction Engineering and Management, 117(04), 674–90.

Moselhi, O, Hegazy, T and Fazio, P (1991) Neural Networks as Tools in Construction. Journal of Construction Engineering and Management, 117(04), 606–25.

Reinschmidt, K F, Griffis, F H ( and Bronner, P L (1991) Integration of Engineering, Design, and Construction. Journal of Construction Engineering and Management, 117(04), 756–72.

Riggs, L S and Hills, J W (1991) Implications for U.S. Construction Companies in 1992 European Community. Journal of Construction Engineering and Management, 117(04), 773–90.

Rowings, J E (1991) Project‐Controls Systems Opportunities. Journal of Construction Engineering and Management, 117(04), 691–7.

Sanders, S R and Thomas, H R (1991) Factors Affecting Masonry‐Labor Productivity. Journal of Construction Engineering and Management, 117(04), 626–44.

Touran, A (1991) Modeling Uncertainty in Operations with Nonstationary Cycle Times. Journal of Construction Engineering and Management, 117(04), 728–35.